Bedford Park, IL Open 24/7 Live reefer
Call 708-252-9373

Frozen cargo rebuilt at the rear of the unit

Frozen Stacks Rebuilt at the Trailer, Close to Chicago

Stacks are down, cartons are smashed, or the lean may get the trailer refused. We put those pallets back together at the rear of the unit, and we do it quickly. A second live reefer rolls in if the cargo has to change units.

Keep the doors from hanging open

Leave a freezer standing open on a dry lot and you start a thaw you will have to explain later. The rebuild happens fast at the rear of the unit. Cargo is moved into a second running reefer if the job needs that step. After we finish, the load is filmed and remains frozen.

Steps on this job

  • Clear fallen stacks from the unit
  • Move ruined cartons away from cases that can still go
  • Build every pallet so it stands true
  • Film, strap, and place the bars
  • Leave the written setting running on the unit for the whole stay

Turned away already

If a dock already sent the trailer back because the stack leaned, a corner was crushed, or product sat on the floor, bring the unit here. Rebuilding it improves the odds at the next appointment.

Commodities we usually see frozen

Ice cream, frozen vegetables, and protein. When the commodity ships frozen, this lot has likely handled a trailer like it before. Name the commodity and the figure written on the bill.

Stacks already down inside a frozen unit?

Phone the lot. Describe the cargo and the mess, or send a photo, before that trailer starts this way.

Call Now